AHU Replacement & Installation at Pioneer House, Manchester
At Morreston Limited, we have recently completed a full Air Handling Unit (AHU) replacement project at Pioneer House in Manchester.
FREE Site Survey Call: 01527 522783
Fresh Air Handling Unit Installation for Hotel HVAC System
Morreston Limited recently completed designing, manufacturing, and installing a state-of-the-art supply and extract fresh air handling unit (AHU) system for a Holiday Inn hotel in Croydon.
The system, featuring a heat pump and heat recovery capabilities, was integrated with associated ductwork finished in Proclad and supported by various extract systems serving multiple areas throughout the hotel.
This project exemplifies our expertise in offsite prefabrication, logistics management, and seamless onsite installation within a strict timeline.
The key requirements were:-
Offsite Prefabrication: Precision-engineered AHU and ductwork components prepared in a controlled environment for optimal quality.
Haulage Operation: Coordinated transport of the prefabricated components to the site.
Crane Lift: Safely positioning the AHU unit and ductwork onto the hotel rooftop.
Complete Site Installation: Comprehensive installation, including system connections, Proclad finishing, and integration with the hotel’s HVAC infrastructure.
We completed the project on schedule by leveraging offsite prefabrication and efficient onsite processes. This project underscores our ability to deliver innovative HVAC solutions tailored to complex client requirements. Our team consistently delivers excellence from offsite prefabrication and logistics coordination to expert onsite installation.
Recent Projects / Case Studies