At Morreston Limited, we have recently completed a full Air Handling Unit (AHU) replacement project at Pioneer House in Manchester, delivering a new, modern, energy-efficient ventilation system.

The project included decommissioning the existing Air Handling Unit (AHU), installing a new Al-ko AHU, and integrating associated pipework and ductwork.

With a well-coordinated haulage, cranage, and plant movement operation, we ensured a seamless transition with minimal disruption to the site.

Decommissioning & Removal: Safely decommission the existing AHU and prepare the site for new equipment.

Haulage & Cranage Operation: Coordinating the transportation and precise lifting of the new AHU.

Plant Movement: Careful positioning and manoeuvring of heavy equipment within a restricted space.

Installation of New System: Installing a high-performance Al-ko AHU, complete with new pipework and ductwork to optimise airflow efficiency.

Replacing old AHU
delivering a new AHU unit
AHU Replacement

The site posed difficulties because of the restricted space for moving equipment. Our team carefully planned the logistics, using specialised lifting and positioning methods to guarantee a safe and efficient installation while reducing downtime. Transporting and lifting the new Al-ko AHU demanded intricate coordination, leading us to collaborate closely with crane operators for a precise lift that minimised disruption to nearby areas.

The client commented,” Morreston have been professional in their approach, with efficient execution and a commitment to delivering a high-quality solution.

This project highlights our expertise in AHU replacement and HVAC system upgrades, reinforcing our reputation as a trusted industry leader. For more information on our services, contact Morreston Limited today.

AHU Replacement
AHU Replacement & Installation

Recent Projects / Case Studies

AHU Refurbishment in Louth

Manufacture of new supply and extract fresh AHU with heat pump/heat recovery complete with associated ductwork finished in Proclad and various extract systems.

Holiday Inn Croydon – AHU Installation

Manufacture of new supply and extract fresh AHU with heat pump/heat recovery complete with associated ductwork finished in Proclad and various extract systems.

Stainless Steel Chilled Water Pipework Installation

An industrial facility required a robust and efficient chilled water pipework system to ensure optimal cooling performance for their cooling coils.